Page : Blog

Blog

The new outdoor training center at Elkhorn Slough Preserve is up and running! The building was designed to match the visual language of traditional agricultural buildings in the Slough, with a corrugated roof and exposed structure. If you're in the area we recommend a visit to the the beautiful pres

read more

Happy fall everybody! It's our favorite time of year as we head into the holidays. Lots of great projects are currently on site, and there's some really exciting new work in development, preparing for a spring start. Happy Halloween, and enjoy a few site photos from a particularly special ADU that's

read more

The Mosquito and Vector Control Laboratory is up and running. The remodeled building converted an old Sheriff's department into an up-to-date laboratory, capable of managing the ever-increasing need to study local mosquito and insect-borne viruses. The remodel provides much needed faciliti

read more

"Staff feels honored to work in such a beautiful space."  "People love to come in the building, just to see what we do; the building works for people.  We also see people coming here to ask for help “self calming” in the space." "People feel truly at home in this space." The US Green Bui

read more

It's been a great summer with lots of projects on site. The Stewart, Mendivil and Crabbe Remodels are complete and look amazing! Construction on Habitat for Humanity on Frederick Street is well underway. The reception area at Emeline is almost complete. Check out some of the things we

read more

Jacquie recently attended the Passive House California 2015 conference in Palo Alto. Passive House represents today's highest energy standard, with the aim of reducing the energy consumption of buildings by up to 80%. When combined with renewable energy systems, such as solar, Passive Hous

read more